Installations | Media | Press | Video
Installation of a Small Continuous Column
Installation of a Small Continuous Column
Installation of a Small Continuous Column
Posted by Distillery Trail
Column Install starts at 3:35
Watch the video to see the entire process from unloading off the truck bed to flying through the air to being bolted to the floor. From A Day on the Trail
Video of the distillery at the Cavalier’s new equipment being installed.
James E Pepper ‘1776’ Distillery has installed their new custom 27′ tall column still! Vendome also built the last still at the historic distillery in 1934, the year Prohibition was repealed.
Southern Distilling installing their new 18″ Stainless Steel Vendome Continuous Column